Explosive Safety Event – potential multiple fatalities. LESSONS LEARNED NOTIFICATION DETAILS:

Two separate pails, each containing thirty boosters and thirty non-electronic detonators, were positioned in an established path of an active stemming loader. The blaster helper set the pails down and then left the area to get additional tools needed for loading holes. The stemming loader operator proceeded forward and ran over the two pails with the right rear tire of the loader.